Section 2 is the part of the Party Wall etc. Act 1996 that deals with modifying or working on an existing party wall or structure. It grants the building owner certain rights but only if the correct procedures are followed under the Party Wall Act Section 2 in Essex.
If you're a homeowner in Essex about to touch, tweak, or tinker with a party wall stop. Breathe. Now read this.
Section 2 is the part of the Party Wall etc. Act 1996 that deals with modifying or working on an existing party wall or structure. It grants the building owner certain rights but only if the correct procedures are followed.
In other words: No sneaky wall drilling at 7 a.m. without telling Bob next door.
If you're planning any work to an existing party wall, yes you absolutely must serve a Party Structure Notice.
Let’s spell it out:
Planning a loft conversion with steel beams into the wall?
Removing a chimney breast?
Cutting into the wall to install flashing?
Dividing gardens with a new wall on the boundary?
If the answer is yes to any of the above, congratulations you’re officially in Section 2 territory.
Take Sue in Colchester. She decided to divide her garden with a new wall, thinking, “It’s my land I can do what I want.”
Not quite. Her wall interfered with the party structure she shared with her neighbour, Mike. Two weeks later? A dispute, solicitor letters, and a barbecue invitation that was mysteriously never sent again.
Moral of the story: Always notify.
Here’s a breakdown of the notifiable works allowed under Section 2:
Raising, thickening, or underpinning a party wall or fence wall
Reducing height or demolishing parts of the wall
Cutting into the party wall to insert beams or flashing
Removing projections that extend over your land
Exposing the wall and providing new weathering protection
Repairing, rebuilding, or demolishing due to defect or disrepair
Replacing non-compliant dividing walls with proper party structures
Demolishing arches or overhangs over public walkways and rebuilding them
Sounds technical? It is. But a party wall surveyor will know exactly what applies to your project.
Some works are too minor to count, like:
Hammering in a nail to hang a painting
Installing a bookshelf with screws
Drilling shallow holes for wall plugs
But here’s the twist: Drilling into a wall for damp proofing? That’s considered notifiable.
So, yes, even the damp can cause drama.
Here’s what the process looks like in real time:
Serve a Party Structure Notice at least two months before you start work.
The Adjoining Owner has 14 days to respond.
They can consent (green light).
They can dissent and appoint a surveyor (standard procedure).
They can do nothing (which also counts as dissent).
If dissent occurs, a surveyor is appointed (or two if each side wants their own).
The surveyor(s) prepare a Party Wall Award a legally binding document covering how the work must be carried out.
It’s like a construction prenup between you and your neighbour.
Serving the wrong type of notice (Section 6 instead of 2? Yep, it happens).
Waiting until weeks before construction to send notices.
Assuming your builder or architect is handling it (spoiler: many don’t).
Sending vague or incomplete plans with your notice.
If your notice is invalid? You start over. No one likes a groundhog day especially not with planning timelines.
Get in touch with a qualified party wall surveyor early. Why? Because a professional will:
Identify if your works fall under Section 2
Draft and serve legally valid notices
Represent your interests in any disputes
Guide you through the Party Wall Award process without a hitch
We once worked with a homeowner in Brentwood who removed a chimney breast to make space for an open-plan kitchen. Beautiful idea. Terrible execution.
No notice was served. The adjoining owner had issues with debris, vibration damage, and wait for it a cracked picture of their grandmother from 1942.
Long story short? After back-and-forth with solicitors and surveyors, the job was delayed by months. A few grand in legal and repair costs later, that open-plan dream was a costly lesson.
Go to Homepage
Section 2 isn’t about bureaucracy it’s about boundaries, fairness, and protecting everyone's property and peace of mind. It’s the law, yes. But it’s also just good sense.
Let's keep it that way, shall we?
At Jason Edworthy Essex Party Wall Surveyor Experts, we offer:
Fast, reliable, and local advice
Drafting and serving of Party Structure Notices
Full surveyor representation for you or both parties
Competitive pricing and total peace of mind
We make the legal side simple so you can focus on making your house a home.